A 32 million cubic meters dam was constructed on the Munte river to supply water to the farm. The installation process, planned and executed by Agrico in its entirety, started with the supply of 3 x 600 mm steel pipelines underneath the dam wall. These pipelines feed water into a containerised pump station supplied from our factory in South Africa.
From the pump station, the water is carried via bulk lines to a booster pump station and then to a holding dam situated at the top of the hill. From here water gravitates into the centre pivot scheme, irrigating lands at a distance of almost 7 km from the dam.